A commercial building where the diaphragm wall carries the building load, acting as both retaining wall and foundation.
Scope of work
Building load rested on the D-wall.
Our team handled alignment, guide wall construction, panel trenching under bentonite, cage lowering and tremie concreting, with continuous quality and safety supervision.


