Two-level basement for a commercial complex in a dense neighbourhood, built with a diaphragm wall retaining system.
Scope of work
2 basements using D-wall as retaining wall.
Our team handled alignment, guide wall construction, panel trenching under bentonite, cage lowering and tremie concreting, with continuous quality and safety supervision.


